Talk to us about your project – 

Precision Power Installation in Central London: Overcoming Logistical Barriers

WhatsApp Image 2025 05 28 At 12.14.26 (2)

Client

150 Borough High Street

Location

London, UK

Equipment/Services

Engineered for Reliability

  • 475KVA Cummins Prime Power Diesel Generator – Acoustic canopy with integral fuel tank and internal silencer, designed for urban environments.
  • DeepSea Control System – Enabling automated start capabilities and full Building Management System (BMS) integration.
  • Automatic Transfer Switch – Facilitating immediate switchover in the event of mains failure.
  • Comprehensive Electrical Installation & Cabling – Ensuring efficiency, compliance, and long-term system performance.

Background

Overcoming Logistical Barriers

At 150 Borough High Street, ensuring uninterrupted power for life safety systems and critical building operations required a robust standby generator solution. However, the congested urban environment presented significant logistical challenges, necessitating a highly coordinated and efficient approach.

Project Overview

Navigating Complex Urban Constraints

The installation site was positioned behind a row of retail units on one of London’s busiest high streets. With no direct access for conventional delivery methods and roadclosure permits unavailable at short notice, traditional offloading was impractical. Additionally, the narrow passageway leading to the final installation location required an exceptional degree of precision handling.

Outcome

Reliable Standby Power with Full Regulatory Compliance

The installation was completed on schedule, meeting all UK regulatory requirements and exceeding client expectations. The site is now equipped with a fully integrated standby power system, safeguarding continuity in the event of mains disruption.​

Talk to us about your project today